This list describes the scale and scope of our major project construction division. This is not an exhaustive list as we routinely work on a multitude of projects. For an up-to-date resume, please contact our business development team.
Our Major Projects
Major Project #1
Kelt Pouce Coupe Battery Upgrade
PROJECT DETAILS:
- Inlet Separator
- Treater Building
- Addition to Tank Farm
- Compressor Install
- VRU Install
- Water Injection Well
- Water Injection Skid
- Pump Building
- Office Building
- MCC and PLC Upgrade.
DURATION:
4 Months
APPROX
CONTRACT
VALUE
$1M-$2M
YEAR COMPLETED:
2016
Major Project #2
Kelt Progress Battery Upgrade
PROJECT DETAILS:
- New MCC Building and PLC
- New inlet separator
- New water injection skid
- New 1000bbl water tank
- 2 New 2000bbl tank
- New oil transfer building
- New metering building
DURATION:
6 Months
APPROX
CONTRACT
VALUE
$1.5M-$2.5M
YEAR COMPLETED:
2017
Major Project #3
Aqua Terra Water Management Gold Creek Plant Upgrade
PROJECT DETAILS:
- Refurbished and Installed MCC
- Installed Water Injection Building
- Filter Pot Building with Upgraded Boost Pump
- Add Two Tanks to Tank Farm
- Convert Existing Facilities from Relay Logic Control to PLC Control.
DURATION:
3 Months
APPROX
CONTRACT
VALUE
$750k-$1.5M
YEAR COMPLETED:
2018
Major Project #4
Modern Resources Wapiti Battery Upgrade
PROJECT DETAILS:
- Compressor addition
- Recycle pump
- Group/Test separator
- 3 Wells
- Solar pump skid
- 6 Production Tanks
- Treater & Office building
DURATION:
5 Months
APPROX
CONTRACT
VALUE
$1.5M-$2.5M
YEAR COMPLETED:
2018
Major Project #5
lnception Sales Compressor
PROJECT DETAILS:
- New sales compressor install with fuel gas metering skid
- Pipeline sales metering skid
- PLC E-House
- New flare system
DURATION:
3 Months
APPROX
CONTRACT
VALUE
$750k-$1.5M
YEAR COMPLETED:
2018
Major Project #6
lnsignia Energy Pouce Coupe Plant Expansion
PROJECT DETAILS:
- Demolition of Decommissioned Buildings
- Install New Compressor
- Treater
- Group Separator
- Test Separator
- MCC
- Oil Recycle Pump Building
- Add 6 Tanks to Tank Farm
- New High Pressure and Low-Pressure Flare System
DURATION:
4 Months
APPROX
CONTRACT
VALUE
$1.5M-$2.5M
YEAR COMPLETED:
2018
Major Project #7
Kelt Exploration (LNG) Inga Lake 24 Well Pad Construction
PROJECT DETAILS:
- 24 Well Pad Construction
- Build and Install Wet Meter Skid on each well
- Install Two Group Separators
- Two Test Separators
- MCC Building
- Flare Knock Out System
DURATION:
3 Months
APPROX
CONTRACT
VALUE
$1.5M-$2.5M
YEAR COMPLETED:
2019
Major Project #8
Pure Life Cannabis Company Heartland Project – Phase 1
PROJECT DETAILS:
- Power Distribution Design and Installation
- Lighting System Design and Installation
- Fire Alarm Design and Installation
- Lighting and Instrument Control Design and Installation
- Design and Installation to Canadian Food Safety Standard
DURATION:
8 Months
APPROX
CONTRACT
VALUE
$1.5M-$2.5M
YEAR COMPLETED:
2020
Major Project #9
Keyera Partnership – AEF to ADT iC8 Line Phase 1 &2
PROJECT DETAILS:
- Install new cable tray, fittings, covers, and barriers.
- Demolition of existing equipment (ESDV’s, PSHH) and associated cables.
- Upgrading control panels with new modules and network switches.
- Installation of Variable Frequency Drive and associated motor control changes.
- Installation of a new UPS system and associated breakers & fiber optic communication parch panel accessories
DURATION:
3 Months
APPROX
CONTRACT
VALUE
$750k-$1.5M
YEAR COMPLETED:
2020
Major Project #10
Kelt 01-14 Battery
PROJECT DETAILS:
- New battery construction
- Inlet Separator LP
- Inlet Separator HP
- Tank Farm
- Compressor Install
- VRU Install
- Water Injection Well
- Water Injection Skid
- Pump Building
- Office Building
- MCC
- PLC Upgrade And Six Wells
DURATION:
5 Months
APPROX
CONTRACT
VALUE
$1.5M-$2.5M
YEAR COMPLETED:
2020
Major Project #11
Kelt Progress Battery Upgrade
PROJECT DETAILS:
- Inlet Separator LP
- Inlet Separator HP
- Tank Farm
- Compressor Install x4
- VRU Install
- Water Injection Wells
- Water Injection Skid
- Pump Building
- Office Building
- MCC x2
- PLC Upgrade
- Generator Install
- Dehy Building
- Treater Building And Amine Building
DURATION:
6 Months
APPROX
CONTRACT
VALUE
$2.5M-$5M
YEAR COMPLETED:
2018
Major Project #12
Diamond LNG – 1 Dawson Groundbirch Pipeline & Tie-In Project
PROJECT DETAILS:
- Supply and install of cables
- Cable tray
- Grounding
- Junction boxes
- Yard lighting
- Electrical heat trace
- Instrumentation and tubing
- Transformers.
- Assisted with HVAC unit installation, Commissioning and Startup.
DURATION:
12 Months
APPROX
CONTRACT
VALUE
$2.5M-$5M
YEAR COMPLETED:
2022
Major Project #13
Kelt Oak Battery
PROJECT DETAILS:
- Full battery build
- Tank farm
- Compression
- Dehy
- Pump skid
- VRU
- Turnkey MCC package
- Instrument air package
- Generators
- Group and test seps
- Additional 4 wells on battery
DURATION:
10 Months
APPROX
CONTRACT
VALUE
$5M-$10M
YEAR COMPLETED:
2022
Major Project #14
Keyera Kaps Power Solutions
PROJECT DETAILS:
- Full design build on a solar hybrid generator package for remote pipeline risers that required 480v power.
- Project was turnkey from design phase, to final product execution on site.
DURATION:
12 Months
APPROX
CONTRACT
VALUE
$2.5M-$5M
YEAR COMPLETED:
2023
Major Project #15
Epic/Diamond LNG Phase 2
PROJECT DETAILS:
- Full design build on LNG pipeline riser tie in points
- Prefabrication of all skids and buildings
- Supply and install of cables, cable tray, grounding, junction boxes, yard lighting, electrical heat trace, transformers and instrumentation.
DURATION:
9 Months
APPROX
CONTRACT
VALUE
$2.5M-$5M
YEAR COMPLETED:
2024
Major Project #16
Kelt La Glace Battery
PROJECT DETAILS:
- Full battery build
- Tank farm
- VRU
- Compression
- Turnkey MCC package
- Instrument air skid
- Dehy
- Water injection package
- Pump skid group and test seps
DURATION:
10 Months
APPROX
CONTRACT
VALUE
$5M-$10M
YEAR COMPLETED:
2024
Major Project #17
Pembina Namao PLC Migration
PROJECT DETAILS:
- Gas Plant PLC upgrade/migration.
- Various MOC jobs throughout facility.
DURATION:
6 Months
APPROX
CONTRACT
VALUE
$1.5M-$2.5M
YEAR COMPLETED:
2024
Major Project #18
Kelt 11-31 Battery Expansion
PROJECT DETAILS:
- Full expansion
- MCC upgrades
- Tank farm additional
- VRU installation
- New compressors
- Pump buildings & office
DURATION:
4 Months
APPROX
CONTRACT
VALUE
$1.5M-$2.5M
YEAR COMPLETED:
2025
Major Project #19
Pembina Becker Road Pump Station
PROJECT DETAILS:
- New custody transfer pump station
- New MCC building
- New pump buildings
DURATION:
6 Months / Ongoing
APPROX
CONTRACT
VALUE
$1M-$2M
YEAR COMPLETED:
2024
Major Project #20
Kelt Farmington Battery
PROJECT DETAILS:
- Full battery build
- Office buildings
- Tank farm
- Inlets
- Dehy
- Compressors
- VRU
- Water Injection
- Transfer Pumps
- Turnkey MCC package
DURATION:
6 Months / Ongoing
APPROX
CONTRACT
VALUE
$5M-$10M
YEAR COMPLETED:
2025